Overview
Herndon station (preliminary names Herndon–Monroe, Herndon–Reston West) is a Washington Metro station in Fairfax County, Virginia on the Silver Line that opened on November 15, 2022. The station is in the median strip of VA-267 adjacent to the current Herndon-Monroe Park and Ride parking garage and bus station, which is on the south side of the highway. It has two pedestrian bridges across SR 267 to reach entrances on either side of the highway. Bus bays are located on the south side of the highway.
History
In anticipation of a future mass transit route in the Dulles Access Road median, in 1999 Fairfax County constructed a $20 million park and ride facility which includes a Fairfax Connector station that serves most bus lines in the Herndon and Reston areas as well as buses carrying commuters to the West Falls Church or other Metro stations daily. The existing facility is served by direct westbound on-ramps and eastbound off-ramps to SR 267. The existing parking garage has 1,750 spaces. The garage has drawn criticism because of alleged construction flaws. The garage has expanded to 3,500 spaces for the Metro station. In the meantime, the Town of Herndon has initiated transportation oriented development of the land on the north side of the station. On November 10, 2009, the town government designated commercial, industrial and multi-unit rental residential properties within the town boundaries for inclusion in a special tax district to fund construction of Phase II of the Silver Line.
The Silver Line was developed in the 21st century to link Washington, D.C., by rail to Washington Dulles International Airport and the edge cities of Tysons, Reston, Herndon, and Ashburn. It was built in two phases; the first phase, linking Washington, D.C., to , opened in 2014. The funding and planning of Phase 2 through Dulles Airport continued while Phase 1 was being constructed. In 2012, the Loudoun County Board of Supervisors voted 5 to 4 to extend the line to Dulles Airport and into the county. On April 25, 2013, the Phase 2 contract was issued at a cost of $1.177 billion.
From Wikipedia (CC BY-SA 4.0).