Shaw Boulevard station is an under-construction underground Metro Rail Transit (MRT) station located on the Metro Manila Subway (Line 9) system in Pasig, Metro Manila, Philippines.
The subterranean facility is positioned along Meralco Avenue near its southern intersection with Shaw Boulevard. Once completed, it will serve as a prominent transit anchor for the eastern extension of the Ortigas Center financial district, providing pedestrian access to premier lifestyle hubs, upscale corporate developments, and high-density estates including the Capitol Commons mixed-use complex and Estancia Mall.
History
The Department of Transportation (DOTr) officially finalized the civil construction footprint for the station on May 5, 2022, under Contract Package 104 (CP104). The ₱17.75 billion contract was awarded to the Tokyu–Tobishima–Megawide Joint Venture (TTM-JV), which pairs local engineering firm Megawide Construction Corporation with Japanese international general contractors Tokyu Construction Co., Ltd. and Tobishima Corporation. The package scope encompasses a 3.4-kilometer (2.1 mi) segment covering both the Ortigas Avenue and Shaw Boulevard underground stations alongside their connecting rail tunnels.
To facilitate deep excavation work along the alignment, a portion of Meralco Avenue was officially closed to vehicular traffic starting in October 2022 to give way to heavy staging areas. Physical pre-construction frameworks progressed steadily, leading up to an on-site project inspection and core civil validation led by President Bongbong Marcos and transportation officials on February 13, 2026. The station is executing a cut-and-cover underground layout with tunnel depths reaching down to 34-meter (112 ft) below the street level, designed to align with the complete system's commissioning targeted by c. 2032.